W/c 21st December 2015
- GF West Toilets – Creation of lift shaft including breaking through existing concrete floor
- GF Old IECL Area - Creation of lift shaft including breaking through existing concrete floor
- GF Old IECL Area – Floor chasing cutting through concrete for drainage
- GF and 1st floor BLL – Fitting of electrical floor boxes (Electrical containment)
- GF BLL – Fitting of head tracks for plasterboard installation
- External of BLL – excavation for formation of slab and drainage
W/c 4th January 2016
- GF West Toilets – Creation of lift shaft including breaking through existing concrete floor
- GF Old IECL Area - Creation of lift shaft including breaking through existing concrete floor
- GF Old IECL Area – Floor chasing cutting through concrete for drainage
- GF and 1st floor BLL – Fitting of electrical floor boxes (Electrical containment)
- GF / 1st and 2nd BLL – Installation of 1st fix plasterboard partitions – fixing into concrete.
- GF West Toilets – Cutting through concrete for drainage installation
- External of BLL – excavation for formation of slab and drainage
In case of any issues with noise levels, please contact Katie Light (katie.light@law.ox.ac.uk, 01865 618076) or Mike Thrift (mike.thrift@admin.ox.ac.uk, 01865 278761) in the first instance. Please do not enter the site area yourself as this is a Health and Safety risk.
The contact details for Beard are: Kenny Hale, Project Manager: 07720275109 or John Cobbold, Site Manager: 07764943852