Building project notices w/c 21 March

Please note: Works on the main core area have now commenced. The SCR and JCR on the 2nd floor and the female toilets on the first floor are now closed. Alternative female toilets are available on the GF by the Cube (where both cubicles will now be for female use) and on the 1st floor adjacent to the English Graduate Common Room. Accessible WC facilities are available on the 1st floor near the English Graduate Common room and in the Bodleian Law Library.

Students and staff are able to use the English Graduate Common Room on the first floor whilst the JCR and SCR are inaccessible. Users should take note of the bookings which will be displayed on the door, when the common room is booked for another event it will be closed to other users.

Please note that a power shutdown to part of the building is planned on Sunday the 20th March.

w/c 21st Mar

  • SF / FF / GF drilling and fixing into concrete and metal for mechanical and electrical works
  • GF laying carpet tiles for floor finishes
  • GF tiling to kitchen area
  • GF WC breaking out and removing concrete
  • External – asphalt roofing installation to book delivery extension
  • GF book delivery extension plastering to walls
  • TF bricklaying to lift shaft
  • SF / FF / GF decorations and painting to stairwells
  •  External – copings to book delivery extension roof
  • External – drop scaffold to book delivery extension
  •  External – window and door installation for book delivery extension
  •  GF book delivery extension paint to walls
  •  SF / FF floor coverings
  • FF / GF paint to walls
  • Main core WCs, SF North wing, Cafe & Senior Common room - heavy demolition noise

Activities expected to take place during the following week (w/c 28th March):

  • GF WCs internal bricklaying
  • GF WCs drilling and fixing for stud partitions
  • GF WCs drilling and fixing into concrete and metal for mechanical and electrical works
  • FF drilling and fixing into concrete and metal for mechanical and electrical works
  •  FF / GF floor coverings
  • GF paint to walls
  • TF lift shaft steel trimming for lifting beam
  • Main core WCs, SF North wing, Cafe & Senior Common room - heavy demolition noise