There are medium to high level noisy works planned on site for this coming Saturday morning (7.30am-1pm) - 16th July.

w/c 18th July

  • Main Core, English Faculty, BLL & Criminology (GF/FF/SF) - drilling & fixing for hoarding erection

  • Main Core and English Faculty (GF / FF / SF / TF) Heavy demolition works throughout

  • Main Core Toilets (GF) - drilling & fixing into concrete & metal for partitions

  • Main Core, English Faculty, BLL & Criminology (GF/FF/SF) - fixing & drilling for mechanical & electrical works

  • BLL Lift (GF / FF / SF) - installation of lift

  • Main Core, English Faculty, BLL & Criminology (GF/FF/SF) - drilling & fixing for partitions

  • DDA Entrance area (GF) heavy demolition works

  • DDA Entrance area (GF) drilling and fixing for electrical works

  • MONDAY Crane lifting steel on main entrance external stairs

Toilet facilities are available on the GF next to the Cube, and on the First Floor adjacent to the English Graduate Common Room.

Bike racks at the back of the building (near the Manor Road entrance) under the building overhang have been reopened.

The readers' entrance to the Law Library has moved to a ground floor door, off the lane which runs between the St Cross Building and the Manor Road Building.

The porters have relocated to a desk by the Manor Road entrance to the building.