Building project updates w/c 31 October
There are medium to high level noisy works planned on site for this coming Saturday morning (8am-1pm) - 29th October.
w/c 31st October
- FF Criminology - painting and decorating
- FF Main Core / Stairs - drilling and fixing for staircase erection
- SF Main Core / Stairs - drilling and fixing for ceilings, partitions, glazed screen installations and staircase erection
- SF Toilets - drilling and fixing for 2nd fix mechanical and electrical fixings
- TF Main Core - drilling and fixing for electrical fixings and glazed screen installations
- Main Lift Shaft - drilling and fixing/moving materials for main lift installation
New toilets have now opened on the first floor near to the main building reception and on the Ground Floor next to Lecture Theatre 2.
Bike racks at the back of the building (near the Manor Road entrance) under the building overhang have been reopened.