Building project update w/c 5 December

 

Please note that there will be a partial shut-down of power on Friday from 6.15am to 8am.

Fire tests are planned from 8am – 9am on Monday 5th December. This will be a number of short blasts of the alarm and there is no need to evacuate when you hear these test blasts.

Please note if you heard a continuous alarm this is a real alarm and so standard evacuation procedures apply.

There are medium to high level noisy works planned on site for this coming Saturday morning (8am-1pm) – 3rd December.

w/c 5th December

  • FF Rear entrance stairs - painting and decorating
  • SF Main Core / Stairs - floor laying, painting and decorating
  • SF Toilets - painting, decorating and cleaning
  • TF Main Core - painting, decorating and cleaning
  • Main Roof - fixing and drilling for roof installation
  • Main Lift Shaft - drilling and fixing/moving materials for main lift installation